Infrastructure must be stronger and more innovative than ever before.

Tappan zee bridgeToday more than ever, there is a robust demand for better bridges and highways. As one of only 53 steel fabricators in the world that is AISC Certified in both Advanced Bridge Fabrication (ABR) and AISC Fracture Critical Endorsement (FC), JGM is a leader in the design, fabrication and erection of large and complex bridges and highways. Plus, we are capable of quickly and accurately producing suspension, truss, complex geometry, tub and box girder, as well as continuous and simple span steel plate girder bridges. Trust JGM and know every arch, truss, beam and cable will seamlessly fit together, ensuring that bridge that is structurally sound.

Potomac Yard Metrorail Station

Crystal Steel | Alexandria, VA

JGM tackles the fabrication, painting and delivery of (2) 200’ long pedestrian bridges for the new Potomac Yard Metrorail Station, requiring JGM follow AISC Fracture Critical criteria.

Partners

enewsletter signup

Receive monthly updates from JGM and stay in the know.