JGM was hired by the Clyde Bergemann Group, an EPC from Malvern, PA, to aid in the relining of the Texas Municipal Power Agency’s two existing tanks. The tanks were located 100-feet in the air and were deteriorating.

Relining was necessary to ensure the proper functionality of these tanks for at least an additional five years.

JGM provided all the rolled tank material needed, as well as the hydroblasting, scaffolding and welding required to turn this project around within just four weeks.

Client

Clyde Bergemann Power Group

Location

Anderson, TX

Timeline

4 Weeks