In 2017 & 2018 the oil and gas industry was racing to build infrastructure in West Texas as horizonal drilling was now able to tap oil and gas reserves never thought possible. JGM was contacted by US Silica, a referral from their engineering firm, to support their Fast-Track fabrication efforts on their 2 new frac sand plants located in west Texas. US Silica was experiencing significant delivery issues with their current fabricator and needed extra horsepower to get them back on track. JGM has a reputation for delivering fabricated products “When you need it yesterday”, so US Silica new they were safe hands. We fabricated over 1200 tons of galvanized structural steel, 300 tons of fabricated chutes and hoppers and over 12,000 LF of 2-line railing all within a 90-day period from time of award. Quality products and dependable deliveries allow construction to move smoothly onsite to hit your critical plant startup dates. Contact us today for your rapid response needs.
US Silica
Midland, TX
4 months